Project
|
Estimated Value/Advertisement Date/Contacts
|
Other Project Information
|
Trades
|
| Miramar Pump Station Meter Project The project consists of a 48-inch diameter, venturi flowmeter installation and associated concrete vault with power, lighting, ventilation, access control, security, and instrumentation. The project will provide metering capabilities for flows from the Miramar Pump Station.
|
Estimated Value $ 750,000.00 - $ 850,000.00
Estimated Advertisement Date: 12-00-08 Bid Opening/Proposal Due Date: --
Contacts Kirk Whitaker
Design Manager
KWhitaker@sdcwa.org
Ph (858)522-6850
Fax (858)522-7802
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades General Contractors; General Engineering; Landscape; Structural Contractors; Welders
|
| Mission Trails Pipeline Tunnel and Vent Demolition The project consists of a 92-inch diameter, 5,000-foot pipeline tunnel from north of Elliot Vent Number 1 to south of Elliot Vent Number 4, and appurtenant facilities for the untreated water system. The Mission Trails Pipeline Tunnel will relieve hydraulic constraints along the Second Aqueduct located North of Mission Gorge and will result in eliminating up to ten Elliot Vents through Mission Trails Regional Park.
|
Estimated Value $ 35,000,000.00 - $ 41,500,000.00
Estimated Advertisement Date: 04-28-2008 Bid Opening/Proposal Due Date: 08-06-2008
Contacts Mike Conner
Contract Manager
mconner@sdcwa.org
Ph (858) 522-6856
Fax (858) 522-6568
Melissa Retener
Contract Technician
mretener@sdcwa.org
Ph (858) 522-6804
Fax (858) 522-6568
|
Project Fact Sheet
Contract Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades General Contractors; General Engineering; Landscape; Structural Contractors; Welders
Other Trade Tunnel Construction
|
| East County Regional Treated Water Improvements Program - Otay Flow Control Facility The project will expand the capacity of the existing Otay 14 Flow Control Facility from 8 mgd to 16 mgd. The facility is comprised of a partially below grade structure with inlet and outlet piping. The address of the facility is 290 South. Third Street, El Cajon, CA 92019.
This expansion will require upsizing about 75’ of 16” piping to 20”. Several mechanical equipment/appurtenances will require replacement including isolation, control, and air valves, venturi flowmeter, valve electric actuator, and minor instrumentation. The existing facility will be subject to civil, mechanical and electrical work. Minor structural modifications to the building will also be required.
Construction is expected to commence in October 2008 and be completed by August 2009.
|
Estimated Value $ 480,000.00
Estimated Advertisement Date: 08-00-2008 Bid Opening/Proposal Due Date: --
Contacts Assem Salam
Ph (858)522-6842
Fax (858)268-7802
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades Electrical; General Engineering; Mechanical; Welders
|
| Emergency Storage Projects – Access Roads, and Marina Grading for San Vicente Dam Raise (Package 2) Drill, blast, and excavate hard rocks to prepare for construction of marina access roads; construct permanent access roads of approximately 3/4 miles in length and 25 feet in width with asphalt pavement; and process about 250,000 cubic yards of rock/soil mix for mass grading for the upcoming marina facilities construction.
|
Estimated Value $ 20,000,000.00 - $ 30,000,000.00
Estimated Advertisement Date: 10-00-2008 Bid Opening/Proposal Due Date: --
Contacts Jim Zhou
Design Manager
jzhou@sdcwa.org
Ph (858) 522-6837
Fax (858) 268-7802
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades
Other Trade General Contractors, Surveying, drill/blasting/(rock) excavation, rock processing, A/C paving, earth
|
| Mission Trails Flow Regulatory Structure II The project consists of a 12 million gallon buried concrete tank and appurtenant facilities for the untreated water system. There will be two 6MG basins with a hopper type bottom. A small building will provide access, ventilation and instrumentation.
|
Estimated Value $ 32,100,000.00 - $ 37,100,000.00
Estimated Advertisement Date: 11-00-2008 Bid Opening/Proposal Due Date: --
Contacts Mike Conner
Contract Manager
mconner@sdcwa.org
Ph (858)522-6856
Fax (858)268-7802
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades Electrical; General Contractors; General Engineering; Landscape; Mechanical; Structural Contractors; Welders
|
| Emergency Storage Projects – Roller-Compacted Concrete Dam and Appurtenant Facilities for San Vicente Dam Raise Construction Package 3 (Specification No. 592) Raise the existing 220-foot dam by 117 feet; place approximately 600,000 cy of roller-compacted concrete; construct about 45-foot high saddle dam; build a new 200-foot tall outlet works tower with a new 300-foot long and 12-foot in diameter tunnel; multiple gates and fish screens; install large diameter pipes, valves and roller gates; install grout curtains in the foundation, consolidation grouting, and seepage prevention grouting for the saddle dam; install an upstream facing system; develop an on-site quarry and RCC mixing plant; mass fill for future marina; build marina facilities including boat ramps, parking lot, comfort stations, etc.
|
Estimated Value $ 260,000,000.00 - $ 300,000,000.00
Estimated Advertisement Date: 10-00-2009 Bid Opening/Proposal Due Date: --
Contacts Jim Zhou
Design Manager
jzhou@sdcwa.org
Ph (858) 522-6837
Fax (858) 268-7802
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades Asphalt Concrete Workers; Cement Mason; Construction Inspector; Electrical; General Contractors; General Engineering; General Engineering Contractors; Graders; Gunite Worker; Laborers; Mechanical
|
SERVICES: PROFESSIONAL and NON-PROFESSIONAL
|
|
|
|
Project
|
Estimated Value/Advertisement Date/Contacts
|
Other Project Information
|
Trades
|
| Project Design Review and Environmental Compliance Monitoring Services for the Carryover Storage and San Vicente Dam Raise Project Contractor will provide design review services during the final design phases of the project and environmental compliance monitoring support services during construction. Services will include monitoring of construction activities to ensure compliance with adopted project mitigation measures, design features, and permit requirements.
|
Estimated Value $ 800,000.00 - $ 1,000,000.00
Estimated Advertisement Date: 02-15-2008 Bid Opening/Proposal Due Date: 03-17-2008
Contacts Paul J. Amberg
Environmental Program Manager
Ph (858)522-6822
Fax (858)268-7881
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades
Other Trade Environmental Compliance Monitors, Biological Resources Monitors, Cultural Resources Monitors, Noise
|
| Design Review - As Needed Services * The Water Authority may use its statement of qualifications database to shortlist for these opportunities.
|
Estimated Value $ 850,000.00
Estimated Advertisement Date: 05-01-2008 Bid Opening/Proposal Due Date: --
Contacts Ilene
Story
istory@sdcwa.org
Ph 858-522-6829
Fax 858-268-7802
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades Electrical; General Engineering; Mechanical; Structural Contractors
Other Trade Civil, Architectual, Instrumentation and Controls, and Corrosion
|
| Electrical Design and Instrumentation and Controls As-Needed Services
* The Water Authority may use its statement of qualifications database to shortlist for these opportunities.
|
Estimated Value $ 500,000.00
Estimated Advertisement Date: 05-01-2008 Bid Opening/Proposal Due Date: --
Contacts Ilene
Story
istory@sdcwa.org
Ph 858-522-6829
Fax 858-268-7802
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades Electrical
Other Trade Instrumentation and Controls
|
| Remote Monitoring for Cathodic Protection Facilities The remote monitoring system for the Water Authority’s Impressed Current
Cathodic Protection (ICCP) and Galvanic Anode Cathodic Protection (GACP)
facilities will allow a single person to monitor the cathodic protection on the
Water Authority’s pipelines remotely by accessing a computer. This system shall
have the following capabilities:
1. Continuously monitor the operation of the ICCP and GACP systems,
allowing for immediate response to equipment failure and vandalism;
2. Cycle the ICCP and GACP systems to properly survey the level of
corrosion protection on a pipeline
B. Remote Monitoring System Requirements: The remote monitoring system
(RMS) requirements include installation of specialized hardware, software, data
transmission capabilities, and Internet website services. The RMS installations
have different requirements for various locations.
|
Estimated Value $ 300,000.00
Estimated Advertisement Date: 05-12-2008 Bid Opening/Proposal Due Date: 06-18-2008
Contacts Aleicia Rangel
Office Assistant
arangel@sdcwa.org
Ph 760-233-3242
Fax 760-480-9867
|
Project Fact Sheet
Contract Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades
Other Trade Corrosion engineering
|
| Mission Trails Regional Park Habitat Restoration Consulting Services Contractor services will include preparation of conceptual landscape design plans, preparation of habitat restoration plans and performance specifications, implementation of landscape and restoration plans, and post-construction monitoring and maintenance. Project includes vernal pool restoration.
|
Estimated Value $ 800,000.00 - $ 1,000,000.00
Estimated Advertisement Date: 06-03-2008 Bid Opening/Proposal Due Date: 07-14-2008
Contacts Paul J. Amberg
Environmental Program Manager
Ph (858)522-6822
Fax (858)268-7881
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades Landscape
Other Trade Landscape Architect- Uplands, Wetlands, and Vernal Pools Habitat Restoration; Biological Resources M
|
| SAFETY, DRUG TESTING, AND FIRST AID SERVICES FOR CONSTRUCTION PROJECTS Successful Contractor will provide on-site safety, drug testing, and first aid services for large construction projects including the Lake Hodges Pump/Storage Project; the San Vicente Dam Raise, Pipeline, and Pumping Facility Projects; and the Mission Trails Flow Regulatory Structure and Tunnels Project.
|
Estimated Value $ 4,000,000.00 - $ 5,000,000.00
Estimated Advertisement Date: 07-17-2008 Bid Opening/Proposal Due Date: 08-15-2008
Contacts Deborah Hack
Management Analyst- Purchasing
Ph (858)522-6657
Fax (858)522-6564
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades
|
| Relining Project Miramar Hill to Scripps Ranch Design services needed
|
Estimated Value $ 300,000.00
Estimated Advertisement Date: 07-24-2008 Bid Opening/Proposal Due Date: 8-27-2008 5:00 p.m. PST
Contacts Jennifer Farrell
Jfarrell@contractors.sdcwa.org
Ph (619)725-5075
Fax (619)725-5079
|
Project Fact Sheet
Contract Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades
|
| Design and Printing of 2008 Annual Report The San Diego County Water Authority is seeking proposals from qualified firms for professional services to design and print the 2008 Annual Report.
|
Estimated Value - $ 50,000.00
Estimated Advertisement Date: 07-28-2008 Bid Opening/Proposal Due Date: 08-11-2008
Contacts Steve Hubert
Public Affairs Rep. II (Graphic Design)
shubert@sdcwa.org
Ph (858)522-6712
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades
Other Trade Graphic Arts, Communications, Graphic Designers, Advertising Agencies, PR Firms, Printers
|
| Design of a 50-Acre Sport Fishery Mitigation Pond The Water Authority is seeking proposals from qualified firms for professional services to complete the evaluation and design of a 50-acre sport fishery mitigation pond at the identified pond site within the California Department of Fish and Game’s Wister Management Area. The project site is located in Imperial County, on the southeast edge of the Salton Sea, Thomas Guide Page 411, B-7, near the intersection of Davis Road and Ruddy Road. The pond is intended to be stocked with various sport fishing species including bass, catfish, and sunfish, and will be open to the general public for shoreline sport fishing purposes.
|
Estimated Value $ 100,000.00
Estimated Advertisement Date: 07-28-2008 Bid Opening/Proposal Due Date: 08-27-2008
Contacts Loisa Burton
Management Analyst
lolivaburton@sdcwa.org
Ph (858)522-6739
Fax (858)522-6565
|
Project Fact Sheet
Contract Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades
Other Trade Geotechnical; Survey; Mapping
|
| Bid No. OM433073008- Generator Maintenance, Testing, Inspection and Repair Generator Maintenance, Testing, Inspection and Repair for Water Authority owned Generators
|
Estimated Value - $ 50,000.00
Estimated Advertisement Date: 07-30-2008 Bid Opening/Proposal Due Date: 08-19-2008
Contacts Aleicia Rangel
Senior Office Assistant
arangel@sdcwa.org
Ph (760) 480-9867
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades Electrical
Other Trade Electrical/Electrical Technician
|
| Emergency Storage Projects - Pipeline 3 Interconnect - DM Design Contractor – Prepare a design for a new ESP pump station on Pipeline 3 of approximately 11.4 cfs capacity.
|
Estimated Value $ 135,000.00
Estimated Advertisement Date: 08-00-2008 Bid Opening/Proposal Due Date: --
Contacts Bill Wood
Project Manager
BWood@contractors.sdcwa.org
Ph (619)543-4307
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades
Other Trade Civil; Hydraulic; Mechanical; Electrical; Instrumentation and Controls
|
| Pipeline 3 Relining Scripps Ranch to SR-52 CM Construction Manager for Relining of approcimately 24,000 linear fet of 69-inch prestressed concrete cylinder pipe with steel liners inserted in up to 16 access portals
|
Estimated Value - $ 3,000,000.00
Estimated Advertisement Date: 08-00-2008 Bid Opening/Proposal Due Date: --
Contacts Jennifer Farrell
Contract Technician
Jfarrell@contractors.sdcwa.org
Ph (619)725-5075
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades Carpenter; Construction Inspector; General Contractors
|
| Emergency Operations Center-Design Review and edit 60 percent design as necessary, continue the architectural design and construction support services for an Emergency Controls Center. The Emergency Controls Center will be approximately 6,500 square feet and will house the relocated Aqueduct Control Room, Emergency Operations Center and associated staff offices. This facility will be designed as an "Essential Facility".
|
Estimated Value
Estimated Advertisement Date: 09-00-2008 Bid Opening/Proposal Due Date: --
Contacts Assem Salam
Project Manager
asalam@contractors.sdcwa.org
Ph (858)522-6842
Fax (858)268-7802
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades
|
| ESP- Operations Center Building upgrade Review and edit 60 percent design as necessary, and continue the design and construction support services for the upgrade of the Escondido Operations Center and the the seismic upgrade of a vehicle maintenance warehouse, both are located at 610 West 5th Avenue, Escondido, CA 92025. The vechicle maintenance warehouse is an 11,250 square foot warehouse that will be seismically upgraded to an "Essential Service Facility"
|
Estimated Value
Estimated Advertisement Date: 09-00-2008 Bid Opening/Proposal Due Date: --
Contacts Assem Salam
Project Manager
asalam@contractors.sdcwa.org
Ph (858)522-6842
Fax (858)268-7802
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades
|
| Miramar Pump Station Rehabilitation Design Contractor- Prepare design for rehabilitation of the existing Miramar Pump Station
|
Estimated Value $ 110,000.00
Estimated Advertisement Date: 09-00-2008 Bid Opening/Proposal Due Date: --
Contacts Bill Wood
Project Manager
BWood@contractors.sdcwa.org
Ph (619)543-4307
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades General Engineering
|
| North County Flow Control Facilities Construction Contractor- Construct three flow control facilities in the Fallbrook-Rainbow area of San Diego County
|
Estimated Value $ 580,000.00
Estimated Advertisement Date: 12-00-2008 Bid Opening/Proposal Due Date: --
Contacts Bill Wood
Project Manager
BWood@contractors.sdcwa.org
Ph (619)543-4307
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades General Engineering Contractors
|
| Mechanical Design Pump Station/ Flow Control Facilities As-Needed Services
|
Estimated Value $ 400,000.00
Estimated Advertisement Date: 12-01-2008 Bid Opening/Proposal Due Date: --
Contacts Ilene
Story
istory@sdcwa.org
Ph 858-522-6829
Fax 858-268-7802
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades General Engineering; Mechanical
Other Trade Civil
|
| Emergency Storage Projects - Pump Station at Pipeline 3 - DM Design Contractor – Prepare a design for a short ESP interconnect pipeline between Pipeline 3 and Pipelines 1 and 2.
|
Estimated Value $ 190,000.00
Estimated Advertisement Date: 8-00-2008 Bid Opening/Proposal Due Date: --
Contacts Bill Wood
Ph (619)543-4307
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades
Other Trade Civil; Hydraulic; Mechanical; Electrical; Instrumentation and Controls
|
| Emergency Storage Projects - Pump Station at Pipeline 4 - DM Design Management ContractorDesign Contractor – Prepare a design for a new ESP pump station on Pipeline 4.
|
Estimated Value $ 250,000.00
Estimated Advertisement Date: 8-00-2008 Bid Opening/Proposal Due Date: --
Contacts Bill Wood
Ph (619)543-4307
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades
Other Trade Civil; Hydraulic; Mechanical; Electrical; Instrumentation and Controls
|
| Emergency Storage Projects - Pipeline 3 Interconnect - CM Construction Management Contractor.
|
Estimated Value $ 185,000.00
Estimated Advertisement Date: 01-00-2009 Bid Opening/Proposal Due Date: --
Contacts Matt Smith
Ph (619)543-4305
Fax (858)268-7802
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades
Other Trade Construction Management; Civil; Mechanical; Geotechnical
|
| Emergency Storage Projects - Pump Station at Pipeline 3 - CM Construction Management Contractor.
|
Estimated Value $ 265,000.00
Estimated Advertisement Date: 01-00-2009 Bid Opening/Proposal Due Date: --
Contacts Matt Smith
Ph (619)543-4305
Fax (858)268-7802
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades
Other Trade Construction Management; Civil; Mechanical; Geotechnical
|
| Emergency Storage Projects - Pump Station at Pipeline 4 - CM Construction Management Contractor
|
Estimated Value $ 330,000.00
Estimated Advertisement Date: 01-00-2009 Bid Opening/Proposal Due Date: --
Contacts Matt Smith
Ph (619)543-4305
Fax (858) 269-7802
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades
Other Trade Construction Management, Civil, Mechanical, Geotechnical
|
|
Print
(Note: To print this web page, please set your page orientation to
landscape.)
|